step 1

Scaffolding is erected and an opening is formed to allow materials to be taken into the loft space.



step 2

Materials arrive on site and are lifted on the landing platform.



step 3

Steels are carefully positioned in the loft area to enable the installation of the floor joists and the removal of the cross members.



step 4

After the steels are in position timbers are then adapted and added to form the general loft space.



step 5

Internal timber partitions are then built which form the separate rooms. Electrical and plumbing installation can then take place.



step 6

Openings are made ready to accept the roof lights.



step 7

Roof lights are installed. Generally any window configuration can be achieved.



step 8

Final touches are then applied, including floors and decoration.